The important genset engine part adopt the Jichai 190 engine part, which is the only national "Gold Award" brand. Jichai has the world's advanced and sophisticated CNC processing equipment and AVL testing equipment, which ensures that the parts have the characteristics of high processing precision and reliable performance, ensuring the reliability and durability of the natural gas generator set power.
Â
Â
Genset model |
500GF-N |
Alternator model |
1FC series, Siemens technology, brushless excitation, automatic voltage control |
Control panel |
GPL500 |
Rated power (kW) |
500 |
Rated voltage (V) |
400V/480V/6300V/10500 |
Rated frequency(Hz) |
50/60 |
Rated power factor |
0.8 |
Wiring method |
3-phase 4-wire/3-phase 3-wire |
Protection class |
IP23 |
Insulation class |
H |
Stabilized voltage adjusting rate |
≤±2.5% |
Voltage recovery time |
≤1.5 s |
Fluctuation of voltage |
≤1.0% |
Stabilized frequency adjusting rate |
0~5% |
Frequency recovery time |
≤7 s |
Fluctuation of frequency |
≤0.5% |
Overall dimension (mm) |
5120×2040×2776.5 |
Engine model |
G12V190ZLTZ-2 |
Type |
4-stroke, V-shaped, turbocharged,air cooling,spark ignition, |
Number of cylinder |
12 |
Bore (mm) |
190 |
Stroke (mm) |
210 |
Total displacement (L) |
71.5 |
Rated speed(r/min) |
1000/1200 |
Rated power (kw) |
550 |
Idle speed(r/min) |
700 |
Gas pressure(KPa) |
100~400 |
Heat consumption(kJ/kW·h) |
≤ 11000 |
Oil consumption(g/kW·h) |
≤ 0.8 |
Exhaust temperature (before turbine ℃) |
≤ 650℃ |
Warm water temperature(℃) |
< 85℃ |
Intercooler water temperature(℃) |
< 45℃ |
Oil temperature(℃) |
< 90℃ |
Speed regulation rate |
0~5 % |
Type of cooling |
open type-cooling tower or closed type-vertical radiator or horizontal radiator |
Lubrication method |
Press and spray lubrication |
Starting method |
Electric starting |
Direction of rotation |
Anticlockwise (facing the power output end) |
Â

Â
Jinan Jingheng Machinery Equipment Co., Ltd. is a high-tech sales and service company in China. The company specializes in the design, installation, operation and maintenance of generator sets and tail gas denitrification projects. In order to meet customers' diverse needs in terms of power, economy and environmental protection, the company is committed to providing customers with EPC overall solutions and turnkey projects such as gas comprehensive utilization system, combined heat and power system (CHP), sewage treatment system, tail gas post-treatment, etc.
Â
https://www.jhecopower.com/